and video documentation revealed a critical pattern: every single failure occurred at seams—the junction lines between sections painted at different times.
Post reporters conducted on-site inspections and identified seven sites where the protective membrane had partially or completely separated from the concrete basin. The deterioration appeared in continue reading …